-40%

Top Quality ETCR4100 Double Clamp Digital Phase Meter ETCR-4100

$ 126.71

Availability: 100 in stock
  • Restocking Fee: No
  • Condition: New
  • All returns accepted: Returns Accepted
  • Refund will be given as: Money Back
  • Brand: Unbranded
  • Item must be returned within: 30 Days
  • Return shipping will be paid by: Buyer
  • Type: Tube Tester

    Description

    Introduction
    :
    ETCR4100 pair of pliers digital phase table is my company has a well- developed specifically for field testing of various phases
    of the instrument , with high accuracy, high stability, low power consumption, easy to use features . Can be measured directly in
    the case of the circuit under test is not open between the two voltages , currents and phase voltages between the two currents
    between , in addition, you can also determine the phase sequence of the three-phase transformer connection group , inductive,
    capacitive circuits , test secondary loop and bus differential protection system , read travel protection CT phase relationship
    between the groups , check the meter wiring is correct or not .
    ETCR4100 double clamp digital phase meter with large LCD display with blue backlight , display clear, exquisite and
    luxurious appearance.
    ETCR4100 pair of pliers digital phase table for the power , petrochemical, metallurgy , railway , meteorology, industrial and
    mining enterprises , scientific research institutions , metering sector.
    Technical Specifications
    :
    1. Baseline conditions and working conditions
    Affect the amount of
    Baseline conditions
    Working conditions
    Remarks
    Ambient temperature
    23 1
    -10 ~ 40
    Environmental wet crossing
    40% -60 %
    < 85%
    Signal waveform
    Sine wave
    Sine wave
    = 0.05
    Signal frequency
    50HZ 1HZ
    45HZ ~ 65HZ
    Operating voltage meter
    9V 0.1V
    9V 1V
    External electric field , magnetic field
    Avoid
    Measured wire position
    Approximate geometric center of the test conductor position in jaws
    2. General Specifications
    Function
    Various phases , phase sequence test ; transformer groups , inductive,
    capacitive circuit discrimination
    Power source
    DC9V alkaline batteries (1.5V AA × 6)
    Power consumption
    Turn on the backlight most about 35mA, working about 40 hours of
    continuous battery
    Off the backlight , instrument consumes about 5mA, for about 300
    hours of continuous battery
    Display Mode
    LCD display , blue backlight , suitable for dark places
    LCD Size
    70mm × 62mm
    LCD display fields
    64mm × 54mm
    Meter size
    Long generous : 196mm × 92mm × 54mm
    Jaw size
    7.5mm × 13mm
    Sampling Rate
    About 3 times / sec
    Range
    0 ~ 360
    Accuracy
    3
    Resolution
    1
    Measuring the phase of the
    signal amplitude range when
    When measuring phase U1-U2 : 30V ~ 500V
    When the measured phase I1-I2 : 10mA ~ 10.00A
    Measured U1-I2 or I1-U2 phase when : 10V ~ 500V, 10mA ~ 10.00A
    Data Retention
    Press HOLD key to keep the test data , "DH" symbol is displayed
    Automatic shutdown
    About 15 minutes after startup , the meter automatically shut down to
    reduce battery consumption
    Voltage detection
    When the battery voltage is lower than 7.8V ~ 8V, low battery symbol
    appears , reminding replace batteries
    Instrument Quality
    Host about 550g ( with battery ) , table clamp about 170g × 2, test line
    about 250g
    Test line length
    1.5m
    Current Clamp Cable Length
    2m
    Working temperature and humidity
    -10 ~ 40 ; 80% Rh or less
    Storage Temperature and Humidity
    -10 ~ 60 ; 70% Rh or less
    Input impedance
    Voltage circuit input impedance is : 2M
    U1U2 measured phase voltage input impedance : 40K
    Resistance to pressure
    Between meter line and shell withstand sine wave AC voltage 1000V /
    50Hz lasted one minute ; able to withstand voltage inputs between the
    two sine wave AC voltage 500V / 50Hz trial lasted one minute
    Insulation
    The line between the meter and the shell , 10M between the two voltage inputs
    Structure
    Double insulation
    Configuration Checklist
    :
    Meter
    A Taiwan
    Meter box
    1
    Current Clamp
    2
    Test line
    4 ( red and black each 2 )
    Battery
    6 ( alkaline batteries : 1.5V AA)
    Manual, warranty card, certificate
    1 part
    The standard package don't include batteries.Because,the international air shipping forbid to ship batteries,Hope you can understand .you can buy them in your local store or supermarket.